Preferred Options November 2021
Search representations
Results for Four Ashes Road LTD search
New searchSupport
Preferred Options November 2021
Question 1
Representation ID: 1603
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
Four Ashes Road Ltd (FAR Ltd) supports the evidence base has been appropriately assessed to inform the new Local Plan. Supports the Council's regard to evidence that will inform an updated Infrastructure Delivery Plan, including input from outside the District where necessary.
Support
Preferred Options November 2021
Question 2
Representation ID: 1604
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd supports the infrastructure projects to be delivered in relation to the proposed site allocations has been identified correctly in the IDP. FAR Ltd considers that there are no further infrastructure options that need to be considered.
Support
Preferred Options November 2021
Question 3
Representation ID: 1606
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd agrees with the overall vision and strategic objectives identified within the Local Plan. However, there are concerns into protecting the Green Belt nd Open Countryside stipulated within the strategic objectives. FAR Ltd agrees with Strategic objective 2, where new development should be focused on sustainable locations and removal of land from the Green Belt in efforts towards unmet needs.
Safeguarded land allocations identified in Policy SAD3 are not strategic in size therefore, should be bought forward in delivery.
FAR Ltd agree with the draft policies within Chapters 4 and 5 and the policy directions within set out in Chapter 6 will deliver these objectives.
Support
Preferred Options November 2021
Question 4
Representation ID: 1607
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd supports the policy approach in Policy DS1 (Green Belt) and Policy DS2 (Open Countryside).
Support
Preferred Options November 2021
Question 5
Representation ID: 1608
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd supports the policy approach in Policy DS3 (The Spatial Strategy to 2038). By allowing growth in the Tier 1 and Tier 2 settlements will provide an opportunity to meet locally arising housing needs and offers opportunity to deliver new services, facilities and infrastructure.
The Spatial Strategy provides the opportunity to ensure that the necessary homes, along with supporting infrastructure. Allocations made in the Local Plan represent high-level options to inform a preferred spatial strategy for housing growth.
Support
Preferred Options November 2021
Question 6
Representation ID: 1609
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd supports the policy approach in Policy DS4 (Longer Term Growth Aspirations for a New Settlement.
Support
Preferred Options November 2021
Question 8
Representation ID: 1610
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd supports the proposed housing allocations in Policy SA5, in particular, site reference 617 at land at Four Ashes Road in Brewood which is a Tier 2 Settlement and would provide a minimum capacity of 63 dwellings.
FAR Ltd is in control of the Land off Four Ashes Road which is promoted for residential development.
FAR ltd intends to undertake further technical work to demonstrate the deliverability of land off Four Ashes Road, however, information gathered to date concludes that there are no physical or other constraints likely to
render the site undeliverable within the proposed Plan period to 2037.
Support
Preferred Options November 2021
Question 11
Representation ID: 1611
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd agree with the proposed policy approaches set out in Chapter 6 and do not anticipate any changes are needed.
Support
Preferred Options November 2021
Question 12
Representation ID: 1612
Received: 06/01/2022
Respondent: Four Ashes Road LTD
Agent: Miss Rebecca Allen
FAR Ltd do not consider there to be any other proposed policies in Chapter 6 which should be identified as strategic policies.
FAR Ltd agree that the proposed fully drafted policies DS1-DS4 and SA1-SA7 are all strategic policies required by Paragraph 21 of the NPPF.