Preferred Options November 2021

Search representations

Results for Four Ashes Road LTD search

New search New search

Support

Preferred Options November 2021

Question 1

Representation ID: 1603

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

Four Ashes Road Ltd (FAR Ltd) supports the evidence base has been appropriately assessed to inform the new Local Plan. Supports the Council's regard to evidence that will inform an updated Infrastructure Delivery Plan, including input from outside the District where necessary.

Attachments:

Support

Preferred Options November 2021

Question 2

Representation ID: 1604

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd supports the infrastructure projects to be delivered in relation to the proposed site allocations has been identified correctly in the IDP. FAR Ltd considers that there are no further infrastructure options that need to be considered.

Attachments:

Support

Preferred Options November 2021

Question 3

Representation ID: 1606

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd agrees with the overall vision and strategic objectives identified within the Local Plan. However, there are concerns into protecting the Green Belt nd Open Countryside stipulated within the strategic objectives. FAR Ltd agrees with Strategic objective 2, where new development should be focused on sustainable locations and removal of land from the Green Belt in efforts towards unmet needs.

Safeguarded land allocations identified in Policy SAD3 are not strategic in size therefore, should be bought forward in delivery.

FAR Ltd agree with the draft policies within Chapters 4 and 5 and the policy directions within set out in Chapter 6 will deliver these objectives.

Attachments:

Support

Preferred Options November 2021

Question 4

Representation ID: 1607

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd supports the policy approach in Policy DS1 (Green Belt) and Policy DS2 (Open Countryside).

Attachments:

Support

Preferred Options November 2021

Question 5

Representation ID: 1608

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd supports the policy approach in Policy DS3 (The Spatial Strategy to 2038). By allowing growth in the Tier 1 and Tier 2 settlements will provide an opportunity to meet locally arising housing needs and offers opportunity to deliver new services, facilities and infrastructure.

The Spatial Strategy provides the opportunity to ensure that the necessary homes, along with supporting infrastructure. Allocations made in the Local Plan represent high-level options to inform a preferred spatial strategy for housing growth.

Attachments:

Support

Preferred Options November 2021

Question 6

Representation ID: 1609

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd supports the policy approach in Policy DS4 (Longer Term Growth Aspirations for a New Settlement.

Attachments:

Support

Preferred Options November 2021

Question 8

Representation ID: 1610

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd supports the proposed housing allocations in Policy SA5, in particular, site reference 617 at land at Four Ashes Road in Brewood which is a Tier 2 Settlement and would provide a minimum capacity of 63 dwellings.

FAR Ltd is in control of the Land off Four Ashes Road which is promoted for residential development.

FAR ltd intends to undertake further technical work to demonstrate the deliverability of land off Four Ashes Road, however, information gathered to date concludes that there are no physical or other constraints likely to
render the site undeliverable within the proposed Plan period to 2037.

Attachments:

Support

Preferred Options November 2021

Question 11

Representation ID: 1611

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd agree with the proposed policy approaches set out in Chapter 6 and do not anticipate any changes are needed.

Attachments:

Support

Preferred Options November 2021

Question 12

Representation ID: 1612

Received: 06/01/2022

Respondent: Four Ashes Road LTD

Agent: Miss Rebecca Allen

Representation Summary:

FAR Ltd do not consider there to be any other proposed policies in Chapter 6 which should be identified as strategic policies.

FAR Ltd agree that the proposed fully drafted policies DS1-DS4 and SA1-SA7 are all strategic policies required by Paragraph 21 of the NPPF.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.