Object
Preferred Options November 2021
Representation ID: 3644
Received: 13/12/2021
Respondent: Mr V Kelly
Representation Summary:
a) IDP is short term and generic - does not recognise the existing needs of Penkridge.
b) Highway infrastructure: village centre needs to be reclaimed form the A449.
A Western Spine Road needs to be introduces to take traffic away from the centre.
Open space strategy - need to look into access to green infrastructure of the River Penk and its flood plain.