Comment

Publication Plan November 2022

Representation ID: 4592

Received: 22/12/2022

Respondent: Taylor Wimpey UK Ltd

Agent: Evolve Planning & Design

Representation Summary:

Taylor Wimpey supports Policy HC15 in respect of education infrastructure which appears to represent a continuation of the current approach.
It should be noted the Land at Cross Green is proposing to deliver a new first/primary school to serve the proposed strategic allocation. This is a requirement set out in Policy SA2. The Development Framework Plan for Cross Green identifies a site of 1.6ha to cater for this new facility which is located within the centre of the site, close to other services and facilities proposed, including a local centre and green infrastructure.
It is recommended that engagement with SCC Education informs further refinement of the Infrastructure Delivery Plan as part of the Local Plan review process. If a First School is required rather than a Primary School, the size of the site necessary to accommodate the school will be less than the 1.6ha identified in Policy SA2. A definitive trigger for requiring the transfer of the land and for the opening of any associated school is also necessary to inform any site phasing plan.