Object
Preferred Options November 2021
Representation ID: 60
Received: 08/11/2021
Respondent: Mr Lee Kelsey
Representation Summary:
There is not going to be enough infrastructure for site 486c. 1976 dwellings in an area that struggles with traffic as it is.