Object

Preferred Options November 2021

Representation ID: 1832

Received: 10/12/2021

Respondent: Wollaston Properties Ltd

Agent: First City Limited

Representation Summary:

Consider there should be increased emphasis on the safeguarding of sites on the edge of the built-up areas to cater for future development needs.

The proposed new settlement will require a significant level of investment, infrastructure and collaboration between a high number of key players/ stakeholders
including land owners. The creation of a new settlement is a momentous task and despite the new settlement being planned for beyond the Local Plan Review period
(beyond 2038), it is important to be realistic in the timeframes in which it will take to deliver a new settlement and therefore there should be the allocation of safeguarded land to cater for future development needs beyond the plan period that can be delivered at a quicker rate and offer an alternative strategy.

Site 211: the land north of Manor House Park, should at the very least be allocated as Safeguarded Land.