Object
Preferred Options November 2021
Representation ID: 1941
Received: 29/03/2022
Respondent: Canal & River Trust
Representation Summary:
Policy SA5
Site 079 - Need to ensure that surface water drainage does not discharge towards the canal.
Site 005 - Add heritage impact mitigation to the key infrastructure requirements for this site in relation to the canal conservation area.