Representation Summary:

The traffic through Essington is already heavy around rush hour and made worse by cut through traffic and parked school traffic. Roads around Essington are not very wide creating issues with lorries. A further 1,200 houses could mean over 2000+ cars to clog up the village. Linthouse Lane has no direct access to the Strategic Road Network; alternative site should be allocated with A road access. Suggest a bypass system to direct traffic for junction 11 around Essington. Suggest painting yellow lines by the shop on the corner of Kingsway and Brownshore Road to reduce congestion. Roads are currently liable to flooding. Getting to work and about for local residents is already difficult enough without further traffic.