Comment

Publication Plan November 2022

Representation ID: 4728

Received: 23/12/2022

Respondent: National Highways

Representation Summary:

With regard to policies SA1 to SA4 we have south to agree a methodology with Staffordshire County Council (as local highways authority). This uses the SATURN model for the M54 - M6 link road proposal to inform site promoters' own technical assessments. This will inform the need for any form of highway mitigation works on the SRN, which is still to be determined.

Design of green infrastructure adjacent River Penk will need to consider environmental mitigation measures (e.g. noise) to address requirements of paragraph 45 of the Departmnet for Transport Circular 02/2013. The green infrastructure is also close to an AQMA (1 Woodbank).

Attachments: