Representation ID: 473
Received: 10/12/2021
Respondent: Bellway Homes Limited (Hyde Lane site)
Agent: Turley
Representation Summary:
- Support overall spatial strategy and need
- Should plan period be to 2039 so 15 years post adoption (based on current LDS)
- Infrastructure delivery risks to Cross Green delivery trajectory - to de-risk safeguarded land at Hyde Lane should be identified
- Some flexibility in approach to small and medium sites and proposed allocations being 1ha (relevant to land at Hyde Lane (west) proposed allocation