Support
Preferred Options November 2021
Representation ID: 794
Received: 13/12/2021
Respondent: Land Fund Limited
Agent: Turley
Representation Summary:
Land Fund consider that the scope of the evidence base prepared to inform the emerging plan is robust and proportionate.
Work undertaken by Land Fund to inform the outline planning permission (Ref. 18/00436/OUT) for residential development on phase one of the development also considered the technical baseline of the future potential residential development on the safeguarded site which now forms a proposed allocation (Site Ref. 239). This technical baseline for the Site (Ref.239) together with the technical support for the site to the south demonstrated that the combined development can be delivered without significant mitigation requirements.