Support

Preferred Options November 2021

Representation ID: 955

Received: 01/02/2022

Respondent: Highways England

Representation Summary:

Policy SA1 - Likely to impact on M54 Junctions 2 & 3 and on A449 north of M54 Junction 2
Policy SA2 - Will directly impact on A449 and M54 Junction 2 and abuts the M54
Policy SA3 - Main traffic impacts likely to be at M54 Junction 1
Policy SA4 - Greatest traffic impacts likely to be at M6 Junction 13 and on A5/A449 Gailey roundabout. Proposed green infrastructure abuts M6.

Have sought to agree a SATURN model with SCC to determine trip distribution and assignment for Local Plan sites. This data is then provided to strategic sites to carry out their own assessments, including mitigation works on SRN.

Detailed specific comments provided for SA2 and SA4.