Preferred Options November 2021

Search representations

Results for Evall Management ltd search

New search New search

Object

Preferred Options November 2021

Question 10

Representation ID: 1823

Received: 13/12/2021

Respondent: Evall Management ltd

Agent: Mr Joe Nugent

Representation Summary:

Site 649 (Essington Quarry, Bognop Road) has direct access to the strategic road network - M54 and A460 and is in close proximity to strategic employment sites such as i54.
Whole or part allocation of site 649 (Essington Quarry, Bognop Road) will form a natural extension to two exisitng employment sites.
Site 649 (Essington Quarry, Bognop Road) provides opportunity for sustainable and accessible employment land at an established location with vehicular access possible off Hilton Main Industrial Estate or via existing commercial access at Bognop Road.
Site 649 (Essington Quarry, Bognop Road) is considered to fall within the classification of PDL as defined by the NPPF with mineral reserves identified to be extracted within the immediate future, thus releasing the site for development.
Allocation of site 649 (Essington Quarry, Bognop Road) for employment purposes does not conflict with any of the five purposes of GB as provided by the NPPF.
Established sites at J1, M54 are seperated from broader urban area and do not form large built-up area; unrestricted sprawl would not occur.
Site 649 (Essington Quarry, Bognop Road) should be assessed for its contribution to employment land needs.
Omission of question relating to employment allocations in Table 9 removes the ability for responses to these allocations. This is considered to render this part of the consultation unsound.

Attachments:

For instructions on how to use the system and make comments, please see our help guide.