Support
Preferred Options November 2021
Representation ID: 1142
Received: 13/12/2021
Respondent: Taylor Wimpey UK Ltd
Agent: Evolve Planning & Design
Representation Summary:
Highlight that even if a suitable or viable option were identified it would take a long time to masterplan and deliver alongside a much larger scale of infrastructure than other development.