Object

Preferred Options November 2021

Representation ID: 1949

Received: 29/03/2022

Respondent: Canal & River Trust

Representation Summary:

GT08 - Mitigate visual impact on canal Conservation Area. Foul and Surface water need to be located away from the canal infrastructure.

Attachments: