Preferred Options November 2021

Ended on the 13 December 2021
For instructions on how to use the system and make comments, please see our help guide.

Appendix E

Employment allocation maps and proformas

Site reference

E33

Address

West Midlands Interchange

Location

Gailey

Site size

297ha

(232.5ha of land removed from Green Belt)

Proposed use

B8 Employment

proforma map

Site infrastructure and access requirements

The sites infrastructure and access requirements are set out in the Development Consent Order (DCO) for the site.

 

For instructions on how to use the system and make comments, please see our help guide.
Share on:
back to top back to top